• Welcome Guest
  • white bg

» Latest revisions of ILAC P4, P5 and R6 published


ILAC P4:05/2019 ILAC Mutual Recognition Arrangement: Policy and Management.
This document provides details on the objectives, foundation, management, procedures and decisions associated with the ILAC MRA. The revision of this document includes criteria for competence of those involved in the evaluation report review process and details for the extension of the ILAC MRA to include the accreditation of proficiency testing providers and reference material producers.

ILAC P5:05/2019 ILAC Mutual Recognition Arrangement: Scope and Obligations.
This document describes the elements of a Mutual Recognition Arrangement for testing and calibration laboratory and inspection body accreditation. The revision includes the policy for transition periods for the implementation of revised standards covered by the ILAC MRA and information relating to the extension of the ILAC MRA to include the accreditation of proficiency testing providers.

ILAC R6:05/2019 Structure of the ILAC Mutual Recognition Arrangement and Procedure for Expansion of the Scope of the ILAC Arrangement.
This document drescribes the structure of the ILAC Mutual Recognition Arrangement as well as the steps to be used by ILAC to consider and approve new international accreditation programs for inclusion in the ILAC Arrangement.

P4 and P5 are available here and R6 is available here.